Completed Waterproofing Project

Project Overview
This Downtown Los Angeles project covered approximately 36,000 square feet of elevated parking deck.
The Waterproofing Challenge
The existing coating was peeling and cracked, and the deck contained joints subject to significant movement. The busy location also required careful planning.
Work Completed
- Investigated the existing coating and concrete conditions.
- Consulted technical support and evaluated a concrete sample.
- Removed failed materials and prepared the deck.
- Detailed moving joints and vulnerable transitions.
- Installed a compatible vehicular coating system.
Project Outcome
The elevated deck received a renewed protective surface designed for vehicle traffic, moisture exposure and ongoing joint movement.