Completed Waterproofing Project

Project Overview
All Weather waterproofed approximately 20,000 square feet of walkways at the Casa Serrana Building.
The Waterproofing Challenge
The busy residential complex required a system that could withstand frequent foot traffic while remaining attractive, durable, economical and easy to maintain.
Work Completed
- Inspected the existing walkway conditions.
- Planned work sequencing around occupied areas.
- Prepared and repaired the walking surfaces.
- Applied a durable waterproof traffic coating.
- Checked transitions, edges and drainage paths.
Project Outcome
The finished walkways provide uniform protection and a practical long-term surface for a heavily used property.
Explore Commercial & Multi-Family Waterproofing Request an Estimate
