Completed Waterproofing Project

Project Overview
All Weather waterproofed the main entrances of multiple Plaza Del Amo apartment buildings.
The Waterproofing Challenge
Main entrances could not remain closed for long. The system and schedule had to support reliable curing while preserving access for residents.
Work Completed
- Reviewed each entrance and planned phased access.
- Prepared and repaired the exposed surfaces.
- Detailed sheet-metal flashing and perimeter conditions.
- Applied fast-curing waterproof coating materials.
- Reopened completed areas according to safe cure times.
Project Outcome
The entrances received durable moisture protection through a tenant-conscious installation schedule.
